Replacing lagging on Vacuum Tower

PetroIneos had a very tight schedule to complete this task as HSE were stopping people from going in the tower until Temporary Lighting was fixed. Originally, they had planned to use fixed Lighting....

Sector Oil & gas

Underside of Heli-deck

Cape were using 2 alternative heaters to heat up an area which normally takes 48 hours to get the temperature up to specification.
They used 2 x SA FLEXIHEAT ATEX Heaters and it took only 1 hour...

Sector Oil & gas

Provide power supply to the Solan

Bi-Fab had the task of painting the legs for the Solan platform. They needed lighting and ventilation inside the tubes so EX power was needed. They had a shortage of power supply around the area so...

Sector Oil & gas

Spot repair in Potwatertank

GDF had a task to blast and paint the potwatertank. This involved steam cleaning the tank, get heat into the tank so it dried quickly then start blasting.
They had the heater running day and night...

Sector Oil & gas

Water injection pump motor

On the Gryphon Alpha, the water injection pump had been redundant for a few months. When needed to be re-instated, the DC motor was damp. They considered sending the motor back to the beach which would...

Sector Oil & gas